The link below is the current resolution approved by the Board of Directors on 02/21/2024 and new water/sewer rates as well as new installation (tap) fees will go into effect 04/01/2024.
VIEW THE REVISED CUSTOMER SERVICE POLICY RESOLUTION - RATES EFFECTIVE 04/01/2024
On 02/15/2023 the Board of Directors adopted resolution 2024-001. Under this resolution the District has adopted NEW water and wastewater rates as followed:
On 02/15/2023 the Board of Directors adopted resolution 2023-003. Under this resolution the District has adopted NEW water and wastewater rates as followed:
CONTACT OUR OFFICE FOR FREE COSTS ESTIMATES FOR NEW WATER AND/OR SEWER CONNECTIONS (INSTALLATIONS)
PLEASE NOTE THAT THIS PAGE IS FOR INFORMATIONAL PURPOSES ONLY AND YOU MUST CONTACT OUR OFFICE AND REQUEST A FREE ESTIMATE FOR NEW INSTALLATION (TAPS) COSTS. ESTIMATES ARE GOOD FOR 30 DAYS ONLY.
On 02/21/2024 the Board of Directors adopted resolution 2024-001. Under this resolution the District has adopted NEW water and wastewater installation/connection fees (taps) as followed:
The Connection Fee for water service includes the current labor, material, administrative costs and charges allowed under the Texas Water Code 49.212.
All Developments requiring a water meter service greater than a 2-inch water will be reviewed on a case-by-case basis to determine a connection fee.
Water Connection Fee Chart
Effective 04/01/2024
Note: Connection Fees will be determined on a case by case basis for 2 inch or larger. All fees above do not include inspection fees, line extentions, or deposits.
The Connection Fee for sewer service includes the current labor, material, administrative costs and charges allowed under the Texas Water Code 49.212.
Gravity Sewer Connection Fee Chart
Effective 04/01/2024
Low Pressure Sewer Connection Fee Chart (grinder unit)
Effective 04/01/2024
Road Bores greater than 25-feet in length and/or greater than 4-inch diameter will be installed by sub-contractors and billed at actual cost of job
On 02/15/23 the Board of Directors adopted resolution 2023-003. Under this resolution the District has adopted NEW water and wastewater installation/connection fees (taps) as followed:
WATER SERVICE
The Connection Fee for water service includes the current labor, material, administrative costs and charges allowed under the Texas Water Code 49.212.
All Developments requiring a water meter service greater than a 2-inch water will be reviewed on a case-by-case basis to determine a connection fee.
Water Connection Fee Chart
Effective 04/01/2023
Note: Connection Fees will be determined on a case by case basis for 2 inch or larger. All fees above do not include inspection fees, line extentions, or deposits.
SEWER SERVICE
The Connection Fee for sewer service includes the current labor, material, administrative costs and charges allowed under the Texas Water Code 49.212.
Gravity Sewer Connection Fee Chart
Effective 04/01/2023
Low Pressure Sewer Connection Fee Chart (grinder unit)
Effective 04/01/2023
Road Bores greater than 25-feet in length and/or greater than 4-inch diameter will be installed by sub-contractors and billed at actual cost of job
On 01/19/22 the Board of Directors adopted resolution 2022-001. Under this resolution the District has adopted NEW water and wastewater rates as followed:
.