CUSTOMER SERVICE POLICY RESOLUTION

The Customer Service Policy Resolution is approved and updated by the Board of Directors. The link below is the current resolution approved by the Board of Directors on 01/19/2022.


External link opens in new tab or windowCLICK HERE TO VIEW THE CURRENT CUSTOMER SERVICE POLICY RESOLUTION

 

NEW CUSTOMER SERVICE POLICY RESOLUTION 2022-001


 

EAST CEDAR CREEK F.W.S.D. APPROVED NEW RATES EFFECTIVE 04/01/2021
On 01/19/22 the Board of Directors adopted resolution 2022-001. Under this resolution the District has adopted NEW water and wastewater rates as followed:



WATER RATES EFFECTIVE 04/01/2022                                                                  SEWER RATES EFFECTIVE 04/01/2022


                        

ADDITIONAL FRANCHISE FEES

WATER:

*Residents within the city limits of Payne Springs includes an additional 4% franchise fee assessed by the City of Payne Springs on both water & sewer.

*Residents within the city limits of Enchanted Oaks includes an additional 2% franchise fee assessed by the City of Enchanted Oaks on both water & sewer.

*Residents within the city limits of Gun Barrel City includes an additional 2% franchise fee assessed by Gun Barrel City

SEWER:

*Residents within the city limits of Payne Springs includes an additional 4% franchise fee assessed by the City of Payne Springs on both water & sewer.

*Residents within the city limits of Enchanted Oaks includes an additional 2% franchise fee assessed by the City of Enchanted Oaks on both water & sewer.

*Residents within the city limits of Gun Barrel City includes an additional 3% franchise fee assessed by Gun Barrel City


 


WATER RATES EFFECTIVE 04/01/2020                                                                   SEWER RATES EFFECTIVE 04/01/2020

DELAYED UNTIL 07/01/2020 DUE TO COVID-19                                             DELAYED UNTIL 07/01/2020 DUE TO COVID-19


                       


ADDITIONAL FRANCHISE FEES

WATER:

*Residents within the city limits of Payne Springs includes an additional 4% franchise fee assessed by the City of Payne Springs on both water & sewer.

*Residents within the city limits of Enchanted Oaks includes an additional 2% franchise fee assessed by the City of Enchanted Oaks on both water & sewer.

*Residents within the city limits of Gun Barrel City includes an additional 2% franchise fee assessed by Gun Barrel City

SEWER:

*Residents within the city limits of Payne Springs includes an additional 4% franchise fee assessed by the City of Payne Springs on both water & sewer.

*Residents within the city limits of Enchanted Oaks includes an additional 2% franchise fee assessed by the City of Enchanted Oaks on both water & sewer.

*Residents within the city limits of Gun Barrel City includes an additional 3% franchise fee assessed by Gun Barrel City


 



EAST CEDAR CREEK F.W.S.D. APPROVED NEW RATES EFFECTIVE 04/01/2021

On 01/19/22 the Board of Directors adopted resolution 2022-001. Under this resolution the District has adopted NEW water and wastewater installation/connection fees (taps) as followed:


CONTACT OUR OFFICE FOR A FREE COSTS ESTIMATE FOR NEW WATER AND/OR SEWER CONNECTIONS (INSTALLATIONS).


WATER SERVICE.

The Connection Fee for water service includes the current labor, material, administrative costs and charges allowed under the Texas Water Code 49.212.

All Developments requiring a water meter service greater than a 2-inch water will be reviewed on a case-by-case basis to determine a connection fee.


          Water Connection Fee Chart

Effective 04/01/2022

                                                                                                 



SEWER SERVICE

The Connection Fee for sewer service includes the current labor, material, administrative costs and charges allowed under the Texas Water Code 49.212.

 

Gravity Sewer Connection Fee Chart

Effective 04/01/2022

                                                                                                     


Low Pressure Sewer Connection Fee Chart (grinder unit)

Effective 04/01/2022

 

               


 Road Bores greater than 25-feet in length and/or greater than 4-inch diameter will be installed by sub-contractors and billed at actual cost of job


 



WATER SERVICE.

The Connection Fee for water service includes the current labor, material, administrative costs and charges allowed under the Texas Water Code 49.212.

All Developments requiring a water meter service greater than a 2-inch water will be reviewed on a case-by-case basis to determine a connection fee.

          Water Connection Fee Chart

Effective 04/01/2019

                                                                                         



 

SEWER SERVICE

The Connection Fee for sewer service includes the current labor, material, administrative costs and charges allowed under the Texas Water Code 49.212.

 

Gravity Sewer Connection Fee Chart

Effective 04/01/2019

                                                                                               


Low Pressure Sewer Connection Fee Chart (grinder unit)

Effective 04/01/2019



* Road Bores greater than 25-feet in length and/or greater than 4-inch diameter will be installed by sub-contractors and billed at actual cost of job



 

CHART OF FEES